(901) 657-2200Get an Estimate

Learn

Do you need an electrical panel upgrade for a heat pump?

Most heat pump jobs reuse the existing circuits. Here is when they don't, what a load calculation checks, and how smaller strips avoid an upgrade.

Last Updated:

The short answer

Usually not. A heat pump often reuses the old AC's circuit, and replacing an electric furnace with a heat pump and smaller strips usually lowers the electrical load. A panel upgrade is needed only when the service can't carry the new equipment safely or there is no room for a required new circuit. A gas-to-electric conversion is the most likely case.

Usually not

Most heat pump replacements in Memphis reuse the circuits that are already there.

The outdoor unit takes over the AC’s circuit, and the air handler takes over the furnace’s. The breaker might change size to match the new nameplate, but the wire, the panel and the service usually stay exactly as they are.

We check before we quote

Bluffline Memphis Heat Pumps checks the panel, the breakers and the wire on the first visit, and lists any electrical change as its own line on the estimate.

When work is more likely

Job Electrical change likely?
Heat pump replacing a heat pump Rarely; existing circuits usually fit
Heat pump replacing an AC, furnace kept (dual fuel) Rarely; outdoor circuit reused
Electric furnace to heat pump Rarely; strips get smaller
Gas furnace to all-electric heat pump Often a new strip-heat circuit
Adding a second system A new circuit for each half

Reading a nameplate

Every outdoor unit and air handler has a nameplate with two electrical numbers that decide the circuit.

Minimum circuit ampacity

The smallest wire size, in amps, that can safely feed the unit. The wire has to be rated at least this.

Maximum overcurrent protection

The largest breaker allowed. The breaker can be smaller, down to what the unit needs to start, but not bigger.

What that means for reuse

If the old circuit’s wire meets the new unit’s minimum ampacity and its breaker is within the maximum, the circuit can stay. Many 3-ton heat pumps fit the circuit a 3-ton AC used. A larger or different unit may not.

Strip heat is the big load

The electric strips in an air handler are by far the largest electrical load in a heat pump system. A 10 kW kit draws about 42 amps at 240 volts; a 15 kW kit about 63; a 5 kW kit about 21.

Electric furnace to heat pump

An electric furnace with 15 kW of strips already has a large circuit. A heat pump with 5 or 8 kW of backup draws less from it. That is why electric furnace to heat pump swaps rarely need a panel upgrade, and sometimes free up capacity.

Gas to electric

A gas furnace draws a few amps at 120 volts for its blower and controls. Replacing it with an air handler and strips adds a new 240-volt circuit the house never had. That is where panels run out of space or capacity. The gas furnace to heat pump page covers that conversion.

Sizing strips to protect the panel

Strips should be sized to the house’s actual need at Shelby County’s 20-degree design temperature, not to the biggest kit the air handler accepts. Many Memphis houses need 5 to 10 kW with a correctly sized heat pump.

Why it matters

  • Smaller strips mean a smaller breaker and less load on the service.
  • A lockout that keeps strips off above about 30 to 35 degrees means they rarely run at all.
  • Staged strips, where the kit comes on in steps, limit the peak draw.

The aux and emergency heat guide explains staging and lockouts.

Older panels and 100 amp services

Many older Memphis houses and West Memphis ranches have 100 amp services. A load calculation adds up the house’s large loads to see whether the service can carry the new equipment.

What the calculation counts

  • The range and oven, the dryer and the water heater if electric.
  • The heat pump and its strips, at their nameplate ratings.
  • Other large loads: a pool pump, a well pump, a workshop, an EV charger.

Panels worth a closer look

Some older panel brands and models have known problems. If your panel is rusted, overheated, full of double-tapped breakers or out of spaces, a licensed electrician should look at it whatever happens with the heat pump.

Signs worth mentioning on the visit include warm breakers, a burning smell near the panel, lights that dim when the AC starts, or breakers that trip without an obvious cause.

A West Memphis example

A 1968 brick ranch in West Memphis has a 100 amp panel, a 1999 electric furnace and an AC. The owners want a heat pump. Here is how the electrical side works out:

Item Old system New system
Backup or furnace strips 10 kW electric furnace 5 kW strip kit
Indoor circuit Large furnace circuit Same circuit, re-breakered to the new nameplate
Outdoor circuit AC circuit Reused; fits the new unit’s ratings
Panel change None None

Why it worked

The house’s heat loss at 20 degrees, with a correctly sized 2.5-ton heat pump, left a gap 5 kW could cover.

A 10 kW kit would have pushed the service calculation past what the panel could safely carry with the range, dryer and water heater. Sizing the strips to the real need kept the panel as it was. Our West Memphis page tells the rest of the job.

The outdoor disconnect

Every outdoor unit needs a disconnect switch within sight of it, so it can be shut off safely for service. When a unit is replaced, the old disconnect often stays if it is sound and rated for the new unit.

When it changes

  • Rust or corrosion inside the box, common after 15 or more Memphis summers.
  • A fused disconnect whose fuses don’t match the new unit’s rating.
  • A moved pad, where the disconnect has to stay within sight of the unit.

Surge protection

Heat pumps have electronic controls, and variable speed units have inverter boards. A surge protector at the disconnect or the panel is inexpensive insurance in a region with summer thunderstorms. It is optional, and it goes on the estimate as its own line if you want one.

Ways to avoid an upgrade

When a panel is close to its limit, there are options short of a new service:

  • Smaller strips, sized to the real need.
  • Dual fuel, keeping a gas furnace as backup instead of strips.
  • Load management devices that keep the strips and another large load from running together.
  • A variable speed heat pump, which carries more of the winter on its own at lower draw.

Generators and outages

If you plan a standby generator, strip heat changes its size. A gas furnace’s blower needs a small generator; 10 kW of strips needs a large one. The ice storm guide covers outage planning.

Who does the work

Panel and circuit work is done by a licensed electrician, with the permit your town requires.

It is listed on the estimate as its own line, with its own price, so you can see what it adds. The cost page has the typical ranges for the heat pump itself.

Questions to ask

Before you sign, ask:

  • Does the existing circuit’s wire and breaker fit the new unit’s nameplate?
  • What strip size does the load calculation call for?
  • Does the panel have room for any new breaker?
  • Is a load calculation on the service needed, and what does it show?

The sizing guide explains how the strip size is chosen, and the Memphis buying guide puts the whole decision in order.

Questions about this guide

Can a 100 amp panel handle a heat pump?

Often, yes. Many 100 amp houses run a heat pump with modest strips. It depends on everything else on the panel: range, dryer, water heater and other large loads. A load calculation answers it for your house.

What size breaker does a heat pump need?

The outdoor unit's nameplate lists a minimum circuit ampacity and a maximum overcurrent protection rating. The breaker and wire have to fit those numbers. Air handlers with strips have their own nameplate ratings for each strip size.

Who does the electrical work on a heat pump job?

Circuit and panel work is done by a licensed electrician, with the permit your town requires. It appears on the estimate as its own line, separate from the heat pump equipment.

Want this answered for your house?

We look at the equipment, the ducts and the panel, and put the scope and the price in writing.

Related service

More guides

Get an estimate for your house

Step 1 of 2

The house and the work